Nisichawayasink Cree Nation: Clearing and grubbing of site. Built a new road. Installed sewer and water main services.
Lyleton: Installed an 11km waterline
Gillam Fox Lake Cree Nation: Installed sewer, water, and land drainage piping. Installed 26 services for future houses.
Gillam Airport: Installed a duplex grinder pump septic tank. Connected to an existing water line. Installed a fire hydrant. Installed a new sewer line service to the airport and shop.
Neepawa Health Centre:
Oberon Well: Installed a 5km raw waterline from pumps and connected to an existing waterline. Installed a meter chamber.
McLaughlin Private Sub Division: Installed water and sewer mainline and services, installed a fire hydrant, installed 2 manholes, and connected to an existing manhole. Installed 12 sewer and water services for future housing.
Neepawa Lift Station: Installing manholes, a forcemain, sewer line, water line, fire hydrants, and a lift station
Virden Rutledge Street: Renewed water and sewer mainline services.
Holland: Ploughed/ directional drilled in a 11km stretch of raw water line. Connected to 2 wells, and connected to the water treatment plant.